Welfare units
At RJ Welfare, we believe that when you treat your site team well, they perform at their best. An easy way to treat them with respect is to provide them with high standards of welfare, enabling them to work, meet, rest and eat in comfort. We believe in supplying a consistently high standard of weekly service, ensuring staff always have a clean and comfortable place to go on site.
Eco-friendly
Lighting and power without generator running
Affordable
Best rates in Northern Ireland
Transportable
Light weight for care-free towing.
Fast set up and take down for fast moving sites
12ft 6 Man Welfare Unit
Measurements:
W 2420 L 3615 H 2700
Unladen Weight 1650kg
Gross Weight 1900kg
Max. capacity: 6 persons
Features:
Quick and Easy Set-up (30seconds)
Lighting without generator for up to 6 hours
10l hot water without generator for up to 4 hours
Simple Connection to mains power
"RJ Welfare's services have exceeded our expectations. The welfare units are comfortable and clean...the perfect spot to log on and work from… the squads are happy too"
— Micheal M at Breedon
Other services
-
Toilet hire
Our Meridian chemical toilets are fully self-contained and do not require a connection to water, drainage or power making them ideal for construction sites where no mains facilities are available.
-
Weekly service
Our comprehensive weekly service keeps your toilets and welfare units fresh and clean for use. We desludge, sanitise, restock supplies and record to keep your toilets pristine throughout the duration of the project.
Frequently asked questions
-
Yes, with only 1900kg gross weight the units are much easier to tow than other steel panelled units of similar size
-
Minimum hire is 1 week
-
Very easy pick up and set down in 30 seconds or less. Gross weight of 1900kg so easy to tow and move. When unhooked from the towing vehicle they can be easily pushed (min 2 persons) into final resting position on hard standing.
-
Yes absolutely, just unplug the 230V generator plug and insert the mains connection plug.
-
The Welfare Cabin is protected from theft with 3 x high security composite doors with 2 deadlocks. Double doors to generator with 2 deadlocks. When in static position the unit also cannot be towed unless access is gained to the controls located inside the welfare cabin.
-
The EcoSmart12 has a host of environmentally sensitive features, including PIR activated lighting that helps to cut down on energy use and running costs. Hot water storage is provided for up to 4 hours without running the generator.
-
Invoiced monthly net 30 days. New customers pay 4 weeks in advance.
-
The EcoSmart12 units are perfect for utility gangs or tight sites with dimensions 2420mm Wide x 3615mm long by 2700mm high.
-
HSE website provides the following requirements for site welfare:
The law states that clients and contractors have responsibilities regarding welfare facilities on construction projects.
Contractors are legally obliged to provide welfare facilities, and clients must ensure this happens. The pre-construction information prepared by the client should include the arrangements for welfare provision.
On notifiable projects (longer than 30 days or 500 person days), the client must ensure the construction phase does not start unless they are satisfied that there are arrangements for welfare facilities to be provided.
Contractors must maintain the welfare units for utility contracts throughout the life of the project. The nature and scale of facilities required will depend on the size, location and type of project. Facilities include, Toilets, Washing facilities, Drinking water, Changing rooms and lockers, Facilities for rest
For more information refer to: https://www.hse.gov.uk/construction/safetytopics/index.htm